The top plate stock must butt tightly together, just as it did when you plated the walls on the subfloor. Nail the double top plate to the top plate with two 16d nails at each end of the wall and at each break in either the top plate or the double top plate. Elsewhere, nail one 16d nail over each stud.Click to see full answer. Also question is, do double top plates need?Joints in the top plates should be offset by at least one stud. If the floor or roof joists resting on the stud wall have the joists line up directly over or within 2 inches of the studs, a double top plate is not required, since there will be no load on the plate other than at the tops of studs.Secondly, do I need a double top plate for a shed? A double top plate is a requirement when building larger garages or houses, but since most sheds don’t exceed 16 feet in any direction, you can skip the double top plate for a single, unbroken top plate. Then, does a double top plate mean load bearing? Double top plates do not automatically mean it is a load bearing wall. The structure above the wall must be examined in order to understand if there is load on any given wall. A double top plate is used anytime you have an 8 foot ceiling where 8ft precut studs were used.How many top plates are required on a wall?3.2 Top plate. Wood stud walls shall be capped with a double top plate installed to provide overlapping at corners and intersections with bearing partitions. End joints in top plates shall be offset at least 24 inches (610 mm). Joints in plates need not occur over studs.

Leave a Reply

Your email address will not be published. Required fields are marked *