How long do you need to stay off a new asphalt driveway?

Q: How long should I stay off the new asphalt? Normally, 24-hours is all that is required to use your new asphalt surface. In very warm weather, we recommend staying off the fresh asphalt for 1 – 2 days, as the surface cools.Click to see full answer. Simply so, is it OK to rain on new asphalt?There is no way around it; asphalt cannot be installed when it is raining outside. Furthermore, asphalt installation projects must be postponed if it has rained recently and the ground is still wet. So when rain comes into contact with fresh asphalt, it causes the oil to rise to the surface.One may also ask, how long do you have to stay off a newly sealed driveway? Explanation: During the summer months of May through August we recommend staying off the driveway with vehicles for 48 hours. After September 1st allow 72 hours or more depending on the temperature. Driveway sealer will dry like paint from the top down. Herein, how long does asphalt have to cure before you can drive on it? six to 12 months Should you water new asphalt?Water down your driveway or parking lot on hot days to cool and temporarily harden the asphalt. Asphalt softens and hardens as temperatures rise and fall. Watering it down is helpful, but not mandatory.

Leave a Reply

Your email address will not be published. Required fields are marked *